Planning and installation
Laying pavement tiles
Information on laying pavement tiles
Click here for the pavement tile laying video
Laying, step by step
The working temperature should be frost-free: +5 to +25 °C
Drainage mats are rolled out on the existing, load-bearing substrate.
The mixing time for the drainage mortar is approx. 5 minutes.
Set out plumb and in alignment. Mark out the levels.
The substrate must have a fall of at least 2 to 3 % to ensure optimal horizontal drainage.
To achieve a sufficient bond between the pavement tile and the single-grain mortar, a contact layer of VIA tile adhesive must be applied to the back of the tile.
The VIA tile adhesive is spread on the back of the tiles as a contact layer.
The VIA tile adhesive is spread on the back of the tiles as a contact layer.
Depending on the substrate, the single-grain mortar layer must reach a thickness of at least 4 to 8.5 cm so that capillary rise of water is effectively prevented.
The VIA pavement tiles are laid against each other with a minimal joint, tapped down firmly and checked for evenness.
Cleaning
VIA pavement tiles should not be cleaned with a pressure washer.