Terrazzo flooring · Installation
Installing terrazzo flooring
Ready-mixed in a 25 kg bucket, simply mixed with water on site. One day later it is ground, then impregnated. The result is a seamless floor.
| Supplied as | 25 kg bucket, ready mixed in the chosen stone mix |
|---|---|
| Coverage | approx. 1 m² per bucket at 1 cm applied thickness |
| Grinding | dry, at the earliest after 24 hours |
| Removal | approx. 3 mm for grain size 6 to 8 mm, finished thickness approx. 7 mm |
| Slip resistance | R9 to R11, depending on grinding |
| Outdoor | not suitable |
In seven steps
- Check the substrateDry, firm, load-bearing and dimensionally stable. Free of dust, oil, grease and loose parts. Remove laitance mechanically. Fit edge insulation strips if none are present.
- MixMix the contents of the bucket with water to a homogeneous, stiff mass. On large areas a forced-action mixer shortens application time.
- ApplyApply trowel by trowel to the clean, primed substrate, smooth off and level. Avoid direct sunlight and draughts.
- Coarse grindingAfter at least 24 hours, grind dry in even passes until the machine runs smoothly. No rolling.
- Close the poresFill voids with VIA Pore Filler, mixed with the grinding dust from the coarse grinding, and spread it with the grout float.
- Fine grindingGrind off filler residue until the floor is clean. A further fine grinding increases the sheen.
- ImpregnateTreat the dry, clean floor with VIA Mineral Impregnator, crosswise, using the floor mop. Silicone joints with natural stone silicone at the earliest 4 days later.
Substrate requirements
| Evenness | to DIN 18202, tolerances in building construction |
|---|---|
| General | Requirements to DIN 18157 |
| Cement screed | at least 28 days old, strength class F4, residual moisture 2.0 CM % maximum, with underfloor heating 1.8 CM % maximum |
| Calcium sulphate screed | Residual moisture 0.5 CM % maximum, with underfloor heating below 0.3 CM %. Prepare according to the BEB guidance sheet on anhydrite screeds |
| Underfloor heating | possible, underfloor heating planning form under Downloads |
Videos
Grinding equipment
Grinding requires a grinding machine with grinding tools, a heavy-duty vacuum and, for the edges, a hand grinder. The equipment can be bought or hired.
With a terrazzo order we lend you the right set: for areas up to approx. 30 m² the grinding machine with hand grinder, for larger areas a planetary grinder with three grinding discs, also with a hand grinder for the edges.
Mosaic borders
Many Gründerzeit floors separate their colour fields with narrow bands of black and white marble pieces. We supply these borders pre-laid on 30 cm long strips. They are pressed into fresh tile adhesive on the screed, and once cured the adhesive tape is peeled off.
The terrazzo is then brought up to the stones from both sides and ground along with them. This leaves the border flush with the floor. We make other borders and mosaic motifs on request, pre-mounted on mesh or for laying on site.
Empty buckets
From 50 pieces we take back empty VIA buckets and send them for recycling. You get €0.50 deposit back for each bucket. Get in touch.
Materials
| VIA Screed Primer | Prime the substrate |
|---|---|
| VIA Edge Insulation Strip | Perimeter joint at all walls |
| VIA Pore Filler | Close voids, with the grinding dust |
| VIA Grinding Tool Set | Edges, corners and small areas |
| VIA Mineral Impregnator | Protection after fine grinding |
| VIA Sealer | for areas exposed to acid, with VIA Primer |
| VIA Mosaic Border | classic taxi border |
| VIA End Profile | Finish at doors and transitions |
| VIA Expansion Profile | Movement joints instead of silicone |
| VIA Protective Fleece | Protection during construction |
Documents
| Technical data sheet VIA Terrazzo | PDF · 55 KB | Download |
| Grinding guide VIA Terrazzo | PDF · 2.1 MB | Download |
| Technical data sheet VIA Pore Filler | PDF · 44 KB | Download |
| Technical data sheet VIA Mineral Impregnator | PDF · 162 KB | Download |